How to estimate a project before you quote it (and review estimate vs actual)

A quote is a promise. If the estimate behind it is a guess, the margin is a guess too. A repeatable method turns estimating into something you can improve each project.

This guide gives a step-by-step method, an illustrative example, and a way to review estimate against actual so the next quote is better. The numbers are examples, not benchmarks.

Step 1: break the work down

List deliverables, then the tasks inside each. The smaller the task, the easier it is to estimate. Note what is excluded.

Step 2: estimate hours by role

For each task, estimate hours per role (design, development, account management). Include meetings, revisions and project management, which are easy to forget.

Step 3: price the hours at cost, then add margin

Multiply hours by each role's internal cost per hour, add contingency, then add your target margin. Using cost, not your billing rate, tells you what the project really costs to deliver.

Worked example (illustrative numbers)

A small website project:

  • Design 30 hours at $50 cost = $1,500.
  • Development 60 hours at $60 cost = $3,600.
  • Project management 15 hours at $55 cost = $825.
  • Subtotal cost $5,925. Add 15 percent contingency: $6,814.
  • To earn a 40 percent margin on price, quote cost divided by 0.6 = about $11,356.

Step 4: choose a pricing model

Fixed price rewards efficiency and punishes underestimating. Time and materials passes risk to the client. A retainer suits ongoing work. Pick the model that matches how well you understand the scope.

Step 5: review estimate vs actual

When the project ends, compare estimated hours with actual hours by role and task type. Keep the gaps in a simple log. After a few projects you will see where you consistently under- or over-estimate, and you can adjust your standard hours.

Propeller9 supports this with project budgets, milestones, tracked time against budget, and project profitability that shows margin and projected margin. The estimate itself is built outside the tool, for example in a spreadsheet, and then entered as the project budget.

Frequently asked questions

How do you estimate an agency project?

Break the work into tasks, estimate hours per role, price the hours at internal cost, add contingency and margin, then quote.

How much contingency should I add?

It depends on how well you understand the scope. Use your own estimate-versus-actual history to decide; we do not publish a standard figure.

Should I quote from cost or billing rate?

Work out cost first so you know the margin, then compare with what hours at your billing rate would produce.

Does Propeller9 build estimates?

No. You build the estimate outside the tool and enter it as the project budget, then track actuals against it.